
SKYLINE OPS· Photovoltaik
Photovoltaic inspection — make hotspots visible before they get expensive.
SKYLINE OPS delivers IEC-compliant thermography, visual inspection and audit-ready reports for ground-mounted and rooftop systems — efficiently from the air.
GDDC Geospatial
Geodata platform — secure beta access now
Capture → Process → Deliver — drone geodata in one platform. Multitemporal orthophotos, point clouds, volumes and DIN-compliant reports — for construction, rail and KRITIS. Sign up for the beta now.

SKYLINE OPS· Photovoltaik
Thermography and inspection platform for PV operators
For: Solar-park operators · O&M providers · assessors · insurers
- Hotspots, string failures, module defects via thermal imaging
- IEC-compliant analysis for operators and assessors
- Large areas efficiently without scaffolding
- DIN IEC TS 62446-3
- ISO 17024 Sachverständige
- On- & Offshore-Erfahrung
- LUC
- DSGVO
- DE-Hosting
Areas of use
What we do for you

Ground-mounted solar parks
Large areas in one flight, string mapping, hotspot maps.
Mehr erfahren →

Rooftop systems & commercial
Safe survey without scaffolding, documentation for operators.
Mehr erfahren →

Damage & insurance cases
Evidence before/after storm or hail damage.
Mehr erfahren →

Recurring O&M
Annual or semi-annual inspection with trend comparison.
Mehr erfahren →
Process
How it works
Step 1
1. Enquiry with plant capacity and location
Step 2
2. Flight planning & IEC-compliant capture
Step 3
3. Analysis with hotspot classification
Step 4
4. Report for operations and assessors
Deliverables
What you receive

Thermograms with temperature overlay

Visual RGB orthophotos

Hotspot list with module/string reference

PDF report for O&M and insurance
Compliance
Legally sound and documented
IEC-compliant analysis, trained thermographers, LBA-compliant flights. Data in Germany.

IEC TS 62446-3
Thermography
< 48 h
Standard report
77 %
Efficiency vs. manual inspection
DE.PStF.022
LBA training
01Which standard applies to thermography?+
DIN IEC TS 62446-3 — analysis and documentation as agreed with your assessor.
02How quickly do we receive the report?+
We answer your specific question in the initial call — usually within 4 hours on business days.
03Do you also fly in cloudy weather?+
We answer your specific question in the initial call — usually within 4 hours on business days.
04Can we work with our own assessor?+
We answer your specific question in the initial call — usually within 4 hours on business days.
Genehmigungs-Finder
Which permit do you need?
In wenigen Schritten zur passenden EU-Kategorie — danach sehen Sie Kurse oder GDDC-Services.
Commission a PV inspection
Plant capacity, area and the desired IEC report — we plan the thermography flight.