KRITIS · Security & Inspection

KRITIS protection. LUC-certified. Legally sound.

Perimeter monitoring and drone inspection for energy, water, IT and transport — high-voltage lines, pipelines, substations. GDDC LUC, documented, legally sound, without LBA waiting time per individual flight when covered by the LUC.

  • Event log for authority and KRITIS audits
  • Emergency overflight on alarm in under 90 seconds
  • Regular patrol (schedulable, documented)
  • Helpdesk integration for the KRITIS ticket workflow
  • SAIL III–IV · BVLOS · hosted in Germany

Operation video

KRITIS inspection from the air

Wind energy and critical facilities — documented flights with Matrice 350 RTK.

SKYLINE OPS· KRITIS

Inspection platform for operators of critical infrastructure

For: Asset managers · grid operators · operations managers · energy · water · telecommunications · gas · rail

  • High-voltage, pipeline, substation — without unnecessary downtime
  • BVLOS corridors and LUC-backed permits
  • Audit-ready reports for regulators and internal audits
  • KRITIS-Dachgesetz · BSIG §8a
  • IT-Sicherheitsgesetz 2.0
  • EU 2019/947
  • LUC GDDC · LBA
  • Audit-Trail exportierbar
  • LUC (Light UAS Operator Certificate)
  • EU OPS-konform
  • DSGVO
  • BNetzA-Anmeldung
  • ISO 27001 (in Vorbereitung)
  • Versicherung 5 Mio. €
  • 11 KRITIS sectors covered

  • < 4

    h response time (business days)

  • 77 %

    Cost saving vs. helicopter

  • 5 M

    € insurance cover

Services for KRITIS operators

  • Compliance monitoring

    Documented flights and events as evidence for authorities.

  • Alarm overflight

    Event-triggered launch — video and GPS to the control room.

  • Patrol

    Scheduled routes with maintenance and QA log.

  • Helpdesk integration

    Automatic tickets on detection — retrofittable into your workflow.

Areas of use

What we do for you

Process

How it works

  1. Step 1

    1. Enquiry via platform or form

  2. Step 2

    2. Automated airspace and permit check (≤ 24 h)

  3. Step 3

    3. Pilot or DJI dock station takes over — live tracking

  4. Step 4

    4. Data delivery in the customer dashboard with AI damage classification

Deliverables

What you receive

  • High-resolution images & videos (RAW + georeferenced)

  • Thermograms with temperature overlay

  • Damage report with classification (DIN-compliant, audit-ready)

  • Digital-twin integration optional

  • Compliance report for regulators

BETA

GDDC Geospatial

Geodata platform — secure beta access now

Capture → Process → Deliver — drone geodata in one platform. Multitemporal orthophotos, point clouds, volumes and DIN-compliant reports — for construction, rail and KRITIS. Sign up for the beta now.

Compliance

Legally sound and documented

LUC-certified operation, BVLOS experience, EU OPS. Data hosted in Germany. Confidentiality by framework agreement, vetted pilots, ConOps per mission.

Hardware & platform

Technology and products for your security operation

Hardware shop

Hardware for KRITIS & perimeter

Dock, thermal drones and accessories — advice on LUC operation and control-room integration.

The catalogue could not be loaded just now (Medusa API). Products are usually visible directly in the shop.

Go to shop →
  • 01May you overfly high-voltage lines without a shutdown?+

    As a rule yes — visually/thermographically from a safe distance; details depend on the voltage level, ConOps and operator requirements.

  • 02How is data sovereignty handled?+

    Raw data and reports belong to the client; processing in Germany, data-processing agreement and deletion periods per your requirements.

  • 03Can you fly BVLOS over 30+ km?+

    Yes — with LUC and an approved corridor flight; we handle planning and NOTAM within the project.

  • 04Which sensors are used?+

    EO, radiometry, optionally methane/spectral for leaks; RTK for georeferencing.

  • 05How quickly is an emergency deployment possible?+

    Response within 4 h on business days; emergency missions subject to availability — SLA definable in the framework agreement.

  • 06Are there framework agreements with flat rates per asset?+

    Yes — volume discounts of 15–30 % for recurring inspections (pylon, line, plant).

Genehmigungs-Finder

Which permit do you need?

In wenigen Schritten zur passenden EU-Kategorie — danach sehen Sie Kurse oder GDDC-Services.

Further reading

Loading form…