SKYLINE OPS· Construction

Drones for construction sites — surveying, progress and documentation in one flight

SKYLINE OPS delivers audit-ready survey data, BIM-aligned 3D models and weekly site documentation. On demand, GDPR-secure, nationwide in Germany.

BETA

GDDC Geospatial

Geospatial platform — join the beta now

Capture → Process → Deliver — drone geodata in one platform. Multitemporal orthos, point clouds, volumes and standards-aligned reports for construction, rail and KRITIS. Sign up for the beta.

SKYLINE OPS· Construction

Construction-site platform for surveying, volumes and 4D progress

For: Developers · general contractors · surveyors · architects · construction supervisors · infrastructure operators

  • Orthophoto, point cloud and BIM export from a single flight
  • Cut/fill and as-built vs. design for billing and site management
  • Weekly progress dashboards for large construction sites
  • LUC
  • DIN 18710 (surveying)
  • BIM Level 2 ready
  • GDPR
  • €5M liability insurance

Use cases

What we deliver for you

Process

How it works

  1. Request

    Submit site plan and coordinates.

  2. Approval & planning

    Permits and flight plan within 24 hours.

  3. Capture flight

    Automated or piloted data acquisition.

  4. Delivery

    Georeferenced data and report in your dashboard.

Deliverables

What you receive

  • Orthophotos (≤ 1 cm GSD)

  • Point clouds (LAS/LAZ, .e57)

  • 3D mesh (.obj, .fbx) for BIM/Revit

  • Volume reports (PDF + .csv)

  • Weekly progress dashboards

Compliance

Legally sound and documented

DIN 18710-aligned surveying, trained pilots, ConOps per site. Data sovereignty stays with the client — hosting in Germany.

  • 3D BIM

    IFC + LandXML export

  • < 2 cm

    RTK GCP accuracy

  • 100 ha

    Survey area per day

  • 48 h

    QA report delivery

  • 01How accurate is the survey data?+

    With RTK/GCP typically < 2 cm horizontally; GSD and CE95 are documented per project in the QA sheet.

  • 02Do you deliver BIM-compatible formats?+

    Yes — point cloud, mesh, IFC/LandXML reference depending on project phase; compatible with common BIM tools.

  • 03Can you fly on active construction sites?+

    Yes — after coordination with site management, ConOps and short-term airspace restrictions if required.

  • 04How does legally sound volume billing work?+

    Polygon-based cut/fill metrics against a reference surface or previous epoch — exportable as PDF/CSV for measurement.

  • 05What does a weekly progress subscription cost?+

    From approx. €1,990/month (STARTER) — depending on area, number of epochs and analysis depth.

  • 06How long from enquiry to first flight?+

    Often 24–72 h after permits; standard projects with a site plan usually within one week.

Genehmigungs-Finder

Which permit do you need?

In wenigen Schritten zur passenden EU-Kategorie — danach sehen Sie Kurse oder GDDC-Services.

Loading form…

Continue with SKYLINE OPS · Construction